Thermal power plants

Nhon Trach 3&4 Power Plant located in Nhon Trach commune, Dong Nai province is an important national project which PV Power is the Owner, SamSung C&T and Lilama Corporation is the Joint-venture EPC Contractor.
Nhon Trach 3&4 Power Plant located in Nhon Trach commune, Dong Nai province is an important national project which PV Power is the Owner, SamSung C&T and Lilama Corporation is the Joint-venture EPC Contractor.
Song Hau 1 thermal power plant with total capacity of 2x600MW is built in Phu Huu A commune, Chau Thanh district, Hau Giang province. The Owner is Petroleum of Vietnam PVN and LILAMA Corporation is the EPC Contractor. Consisting of 02 machine units, the plant’s Boilers and turbines use advanced super critical technology in the world today.
Song Hau 1 thermal power plant with total capacity of 2x600MW is built in Phu Huu A commune, Chau Thanh district, Hau Giang province. The Owner is Petroleum of Vietnam PVN and LILAMA Corporation is the EPC Contractor. Consisting of 02 machine units, the plant’s Boilers and turbines use advanced super critical technology in the world today.
Vung Ang 1 thermal power plant had the Owner Petroleum of Vietnam PVN and LILAMA Corporation was the EPC Main Contractor. The project was built in Ky Anh town, Ha Tinh province. This is the biggest thermal power plant now in Central Vietnam and one of the 4 plants of Vung Ang Thermal Power Centre. Its capacity is 1,200MW (2x600MW), the annual power output is 7.2 billion kWh/year.
Vung Ang 1 thermal power plant had the Owner Petroleum of Vietnam PVN and LILAMA Corporation was the EPC Main Contractor. The project was built in Ky Anh town, Ha Tinh province. This is the biggest thermal power plant now in Central Vietnam and one of the 4 plants of Vung Ang Thermal Power Centre. Its capacity is 1,200MW (2x600MW), the annual power output is 7.2 billion kWh/year.
Extension Uong Bi thermal power plant 300MW has the Owner Electricity of Vietnam EVN. It was the first time a large national plant was invested in with entire domestic capital and the EPC Contractor is LILAMA Corporation. All technical designs met international standards. Designing work and plant quality was supervised, inspected by experts from Consultation Company POYR (Switzerland).
Extension Uong Bi thermal power plant 300MW has the Owner Electricity of Vietnam EVN. It was the first time a large national plant was invested in with entire domestic capital and the EPC Contractor is LILAMA Corporation. All technical designs met international standards. Designing work and plant quality was supervised, inspected by experts from Consultation Company POYR (Switzerland).
Nghi Son 2 thermal power plant has total capacity of 1,330MW consisting of 2 machine units. This is the first BOT project the Government realized to grant bid through international bidding procedures.
Nghi Son 2 thermal power plant has total capacity of 1,330MW consisting of 2 machine units. This is the first BOT project the Government realized to grant bid through international bidding procedures.
Owner: Petroleum of Vietnam. EPC Main Contractor: LILAMA Corporation. The Project consists of two combine cycle power plants 2x1 using 4 turbines of F generation. Each plant has capacity of 750MW with gas consumption of about 900 million m3/year/plant, equivalent to 3.1 million m3/day.
Owner: Petroleum of Vietnam. EPC Main Contractor: LILAMA Corporation. The Project consists of two combine cycle power plants 2x1 using 4 turbines of F generation. Each plant has capacity of 750MW with gas consumption of about 900 million m3/year/plant, equivalent to 3.1 million m3/day.
Vung Ang 2 BOT Thermal Power Plant has the total investment of 2.2 billion USD that located in Ky Loi commune, Ky Anh district, Ha Tinh province, the Owner is Vung Ang 2 Power LLC (VAPCO), the EPC Contractor is Doosan Heavy Industries and Construction.
Vung Ang 2 BOT Thermal Power Plant has the total investment of 2.2 billion USD that located in Ky Loi commune, Ky Anh district, Ha Tinh province, the Owner is Vung Ang 2 Power LLC (VAPCO), the EPC Contractor is Doosan Heavy Industries and Construction.
Van Phong 1 BOT Thermal Power Plant is owned by Sumitomo Corporation. It has the total investment of 2.58 billion USD and commenced in October 2019 composing of 2 units with a total capacity of 1,320MW. When putting into commercial operation, the plant shall supply an electricity production of about 9 billion kWh per year.
Van Phong 1 BOT Thermal Power Plant is owned by Sumitomo Corporation. It has the total investment of 2.58 billion USD and commenced in October 2019 composing of 2 units with a total capacity of 1,320MW. When putting into commercial operation, the plant shall supply an electricity production of about 9 billion kWh per year.