Latest news
- Nhon Trach 3&4 Gas Power Plant Project: Racing up for destination /
- LILAMA commences the assembly works of 27 green hydrogen modules for H2GS Project (Stegra)/
- LILAMA CONSTRUCTION TEAM No.2 ACHIEVES 3 MILLION SAFE MAN HOURS IN NEOM GH2 MODULES FABRICATION AND ASSEMBLE FACTORY/
- Mr. Nguyen Van Hung appointed as the President & CEO of LILAMA Corporation/
- LILAMA commenced fabricating and assembling 27 green hydrogen modules for H2Gs Project/
- LILAMA energized successfully Main Transformer of Nhon Trach 3 Combined Cycle Power Plant Project /
- LILAMA Corporation held successfully the Annual General Meeting of Shareholders year 2024/
- LILAMA “SOLDIERS” IN GLOBAL GREEN ENERGY MARKET/
- LILAMA 10 SUCCESSFULLY INSTALLED GENERATOR ROTOR FOR NHON TRACH 4 GAS POWER PLANT PROJECT/
- VUNG ANG 2 TPPP – SUCCESSFUL HYDROSTATIC TEST FOR BOILER 2 /
- LILAMA enters the project chain on green renewable energy toward sustainable development/
- Joint-venture of LILAMA 18 signed an EPC contract to implement Block-B O Mon Gas Pipelines Project/
- LILAMA installed generator for Nhon Trach 3 & 4 Power Plant Project/
- LILAMA ASSERTS ITS POSITION IN THE GLOBAL GREEN ENERGY SUPPLY CHAIN/
- Installing Generator and Placing Turbine into foundation for Nhon Trach 3 Plant project/
Fields of activity
LILAMA - Leading EPC Contractor in Vietnam
Beginning with Uong Bi thermal power plant and bequeathing successes in many projects, LILAMA has
Beginning with Uong Bi thermal power plant and bequeathing successes in many projects, LILAMA has proven that the Government assigns domestic contractors to be EPC Main Contractors of projects is right.
Over nearly 60 years building up and developing, with LILAMA, achievements attained are thousands
Over nearly 60 years building up and developing, with LILAMA, achievements attained are thousands of projects, factories which have been installed safely, accurately and put into use on time, operating well, bringing about great effect to our national economy.
With modern specialized machines, LILAMA has manufactured much equipment having complicated form
With modern specialized machines, LILAMA has manufactured much equipment having complicated form and variety in type. Products made by LILAMA can meet the most severe requirments in technique, fine art and always satisfy our customers.
Over the past 55 years of construction and development, LILAMA has created a prestigious brand name
Over the past 55 years of construction and development, LILAMA has created a prestigious brand name in machinery installation and equipment manufacture branch and become a trustworthy address for domestic and international customers. The field of repairing and maintaining industrial plants, projects has been always one of strong points contributing to bring in successes to LILAMA over the past time.
Applying advanced technology in design and professionalism in managing procurement bidding
Applying advanced technology in design and professionalism in managing procurement bidding (Sections E and P in EPC contracts) have brought about a great progress in the work of consultation, design and project management to LILAMA.
- Nhon Trach 3&4 Power Plant located in Nhon Trach commune, Dong Nai province is an important national project which PV Power is the Owner, SamSung C&T and Lilama Corporation is the Joint-venture EPC Contractor.
- Song Hau 1 thermal power plant with total capacity of 2x600MW is built in Phu Huu A commune, Chau Thanh district, Hau Giang province. The Owner is Petroleum of Vietnam PVN and LILAMA Corporation is the EPC Contractor. Consisting of 02 machine units, the plant’s Boilers and turbines use advanced super critical technology in the world today.
- Vung Ang 1 thermal power plant had the Owner Petroleum of Vietnam PVN and LILAMA Corporation was the EPC Main Contractor. The project was built in Ky Anh town, Ha Tinh province. This is the biggest thermal power plant now in Central Vietnam and one of the 4 plants of Vung Ang Thermal Power Centre. Its capacity is 1,200MW (2x600MW), the annual power output is 7.2 billion kWh/year.
- Son La hydro power plant is the project on Da River belonging to It Ong commune, Muong La district, Son La province, Vietnam. The plant has capacity of 2,400MW with 6 machine unit and it was commenced on December 2nd 2005.
- Lai Chau hydro power or Nam Nhun hydro power was a national important project of Vietnam. It was built on main stream of Da River belonging to Nam Nhun town, Nam Nhun district, Lai Chau province, Vietnam. Lai Chau hydro power plant has the total installed capacity of 1,200MW with 3 machine units and it was commenced on January 5th 2011, merging electricity from 3 machine units into power national grid in November 2016. The plant was inaugurated in December 2016, one year ahead of target defined by the National Assembly.
- Extension Uong Bi thermal power plant 300MW has the Owner Electricity of Vietnam EVN. It was the first time a large national plant was invested in with entire domestic capital and the EPC Contractor is LILAMA Corporation. All technical designs met international standards. Designing work and plant quality was supervised, inspected by experts from Consultation Company POYR (Switzerland).
- Nghi Son Oil Refinery Plant is a completed project in Nghi Son Economic Zone, Thanh Hoa. Products of the plant consists of LPG gas, petrol, diesel, oil, aeroplane fuel … used mainly in domestic market.
- Tan Thang cement project with capacity of 5,000 tons of clinker per day is constructed in Tan Thang commune, Quynh Luu district, Nghe An province, using equipment, production line imported from countries of EU, G7. The Owner is Tan Thang Cement JSC, the EPC Main Contractor Consortium between LILAMA Corporation and Vinaconex E&C is responsible for project performance.
- Nghi Son 2 thermal power plant has total capacity of 1,330MW consisting of 2 machine units. This is the first BOT project the Government realized to grant bid through international bidding procedures.
- Dung Quat Oil Refinery Plant belonging to Dung Quat Economic Zone is the first oil refinery project in Vietnam. It was built in Binh Thuan and Binh Tri communes, Binh Son district, Quang Ngai province. It was one of the large, important economic projects of Vietnam at the beginning of 21st century.
- Owner: Petroleum of Vietnam. EPC Main Contractor: LILAMA Corporation. The Project consists of two combine cycle power plants 2x1 using 4 turbines of F generation. Each plant has capacity of 750MW with gas consumption of about 900 million m3/year/plant, equivalent to 3.1 million m3/day.
- Thang Long cement plant has the Owner Thang Long Cement JSC. This has been considered one of the biggest cement projects in Vietnam up to now. It is one of the plants which have been invested in with high “interiorization rate” of 60%, from manufacturing kiln shells, kilns, electrostatic precipitator, coal grinding devices … to installing equipment.
- Vung Ang 2 BOT Thermal Power Plant has the total investment of 2.2 billion USD that located in Ky Loi commune, Ky Anh district, Ha Tinh province, the Owner is Vung Ang 2 Power LLC (VAPCO), the EPC Contractor is Doosan Heavy Industries and Construction.
- Van Phong 1 BOT Thermal Power Plant is owned by Sumitomo Corporation. It has the total investment of 2.58 billion USD and commenced in October 2019 composing of 2 units with a total capacity of 1,320MW. When putting into commercial operation, the plant shall supply an electricity production of about 9 billion kWh per year.
- Nhon Trach 3&4 Power Plant located in Nhon Trach commune, Dong Nai province is an important national project which PV Power is the Owner, SamSung C&T and Lilama Corporation is the Joint-venture EPC Contractor.
- Vung Ang 2 BOT Thermal Power Plant has the total investment of 2.2 billion USD that located in Ky Loi commune, Ky Anh district, Ha Tinh province, the Owner is Vung Ang 2 Power LLC (VAPCO), the EPC Contractor is Doosan Heavy Industries and Construction.
- Van Phong 1 BOT Thermal Power Plant is owned by Sumitomo Corporation. It has the total investment of 2.58 billion USD and commenced in October 2019 composing of 2 units with a total capacity of 1,320MW. When putting into commercial operation, the plant shall supply an electricity production of about 9 billion kWh per year.
- Song Hau 1 thermal power plant with total capacity of 2x600MW is built in Phu Huu A commune, Chau Thanh district, Hau Giang province. The Owner is Petroleum of Vietnam PVN and LILAMA Corporation is the EPC Contractor. Consisting of 02 machine units, the plant’s Boilers and turbines use advanced super critical technology in the world today.
- Vung Ang 1 thermal power plant had the Owner Petroleum of Vietnam PVN and LILAMA Corporation was the EPC Main Contractor. The project was built in Ky Anh town, Ha Tinh province. This is the biggest thermal power plant now in Central Vietnam and one of the 4 plants of Vung Ang Thermal Power Centre. Its capacity is 1,200MW (2x600MW), the annual power output is 7.2 billion kWh/year.
- Son La hydro power plant is the project on Da River belonging to It Ong commune, Muong La district, Son La province, Vietnam. The plant has capacity of 2,400MW with 6 machine unit and it was commenced on December 2nd 2005.
- Lai Chau hydro power or Nam Nhun hydro power was a national important project of Vietnam. It was built on main stream of Da River belonging to Nam Nhun town, Nam Nhun district, Lai Chau province, Vietnam. Lai Chau hydro power plant has the total installed capacity of 1,200MW with 3 machine units and it was commenced on January 5th 2011, merging electricity from 3 machine units into power national grid in November 2016. The plant was inaugurated in December 2016, one year ahead of target defined by the National Assembly.
- Extension Uong Bi thermal power plant 300MW has the Owner Electricity of Vietnam EVN. It was the first time a large national plant was invested in with entire domestic capital and the EPC Contractor is LILAMA Corporation. All technical designs met international standards. Designing work and plant quality was supervised, inspected by experts from Consultation Company POYR (Switzerland).
- Nghi Son Oil Refinery Plant is a completed project in Nghi Son Economic Zone, Thanh Hoa. Products of the plant consists of LPG gas, petrol, diesel, oil, aeroplane fuel … used mainly in domestic market.
- Tan Thang cement project with capacity of 5,000 tons of clinker per day is constructed in Tan Thang commune, Quynh Luu district, Nghe An province, using equipment, production line imported from countries of EU, G7. The Owner is Tan Thang Cement JSC, the EPC Main Contractor Consortium between LILAMA Corporation and Vinaconex E&C is responsible for project performance.
- Nghi Son 2 thermal power plant has total capacity of 1,330MW consisting of 2 machine units. This is the first BOT project the Government realized to grant bid through international bidding procedures.
- Dung Quat Oil Refinery Plant belonging to Dung Quat Economic Zone is the first oil refinery project in Vietnam. It was built in Binh Thuan and Binh Tri communes, Binh Son district, Quang Ngai province. It was one of the large, important economic projects of Vietnam at the beginning of 21st century.
- Owner: Petroleum of Vietnam. EPC Main Contractor: LILAMA Corporation. The Project consists of two combine cycle power plants 2x1 using 4 turbines of F generation. Each plant has capacity of 750MW with gas consumption of about 900 million m3/year/plant, equivalent to 3.1 million m3/day.
- Thang Long cement plant has the Owner Thang Long Cement JSC. This has been considered one of the biggest cement projects in Vietnam up to now. It is one of the plants which have been invested in with high “interiorization rate” of 60%, from manufacturing kiln shells, kilns, electrostatic precipitator, coal grinding devices … to installing equipment.
News - Event
23.03.2023
05.05.2021
30.09.2020
16.01.2020
10.12.2019
25.07.2019
09.01.2019